7 Reasons a Second Simulator Makes Sense
There’s no doubt that your Nuclear Power Plant simulator is one of your most valuable and heavily used training resources.

Three Reasons Why You Should Outsource Your Inspection Scope Optimization
An Inspection Scope Optimization (ISO) for Flow Accelerated Corrosion…

Multiple Methodologies for Inspection Scope Optimization: Which is right for you?
What is the process for performing an Inspection Scope Optimization?
Inspection…

Predicting Wear: How to use Pass 2 Analysis
The documentation of a Pass 2 Analysis can have a wide range…

Six Benefits of Pass 2 Analysis
Undetected, corrosion is a safety issue. Precision Wear Rate…

Outsourced Staffing: 5 reasons why it works
Recruiting the right talent means finding them first, then training…

Data, Risk and Turbines
By Frank Todd, Manager Thermal Performance
Featured in EnergyTech Magazine
We all have had to make a decision based on information that we were not quite sure was reliable, knowing that the decision could cost us quite a packet (English slang for a whole

PPA Procedure Writer Certification: Why you should get certified
Procedures drive the safe and efficient operation of the company. They must be well written, clearly understood and accurate to support error-free performance.

Can your simulator "cope" with the new FLEX equipment guidelines
The Nuclear Regulatory Commission’s (NRC) Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident states that plants should...

Should You Outsource NRC Generic Fundamentals Training?
The Generic Fundamentals Examination (GFE) is the first in a series of examinations administered by the NRC to reactor operators.

It's time to replace your proprietary plant hardware with new simulation software
Relying on plant hardware to run specific plant control systems leads to several problems.

A Severe Accident is a Site-wide Event
The incident at Fukushima Daiichi Nuclear Power Plant back in 2011 taught the industry many lessons.